Richard C. Smith, Jr.
President
CenterPoint Engineering Inc.

Mr. Smith has over 16 years of experience in site engineering and land development design for commercial, residential, and government projects.

Project Experience

Some of Mr. Smith’s projects include:

Breckinridge North, Gwinnett County, Georgia: Mr. Smith was project manager for the development of a fifty acre industrial park. At build out this project consists of over 450,000 square feet of building area. A 1,500 linear foot Gwinett County industrial standard roadway was designed to serve the project. To maximize the land use a hydrology study was prepared to utilize an adjacent creek for stormwater detention, thus eliminating the need for any on site detention ponds.

Barrett, Cobb County, Georgia: Mr. Smith has served as a project manager or engineer for this 960 acre mixed development since 1985. Responsibilities have included roadway design for the project’s major parkway, site designs for individual parcel users, and the creation of marketing materials. These marketing materials include a full color CAD database of the entire project that is continuously updated as the project develops.

Atlanta South, Clayton County, Georgia: As project manager, Mr. Smith has overseen the civil engineering requirements for this 54 acre industrial park located near Atlanta-Hartsfield International Airport. With over 600,000 square feet of building space planned the project is currently completing the construction of the fifth and sixth buildings. All six buildings have been designed by Mr. Smith, including a recently completed 214,000 square foot facility.

5445 Old Dixie Road, Clayton County, Georgia: Mr. Smith served as project manager for a 134,000 square foot front loader distribution facility located in Southfield Corporate Center. The project is located on 9.2 acres and required coordination and permitting with the Georgia Department of Transportation to modify an existing driveway. Mr. Smith’s duties included site layout, grading plans, utility plans, and hydrological analysis.

Gwinnett County Progress Center, Gwinnett County, Georgia: Mr. Smith served as project manager in charge of creating, coordinating, and updating a CAD database for this 1,500 acre industrial park. The database enables the client immediate access to the latest infrastructure, land use, and various other modifications made to the project.

Education B.S. Engineering, 1985, The University of Florida

Certification Professional Engineer Georgia

Copyright © 2002 CenterPoint Engineering, Inc. All rights reserved.